Service
EV Charger Installation & Commissioning
Complete EV charger installation and commissioning support for commercial, public, fleet, hospitality, and institutional charging sites in Himachal Pradesh.

Step-by-step process
- 01
Site survey
confirm charger location, power availability, and cable route.
- 02
Foundation & mounting
pedestal/wall mount prepared to the charger's spec.
- 03
Electrical connection
cabling, protection, and power termination to the charger.
- 04
Configuration
network/OCPP setup, tariff and access settings as required.
- 05
Testing & commissioning
insulation, earth-continuity, load and functional tests.
- 06
Handover
documentation, photos, and a walkthrough of safe operation.
Standards we follow
- Manufacturer installation & commissioning guidelines
- IS/IEC electrical wiring and protection practices
- IS 3043 earthing practice for charger safety
- Load and RCD/SPD protection sizing to sanctioned load
Service level & commitments (SLA)
- Site survey scheduled within 2–3 working days of confirmation
- Commissioning report + test readings shared at handover
- Workmanship warranty on installation (period confirmed in the scope)
- Post-commissioning support window for teething issues
What's included
- Charger mounting and installation
- Electrical connection
- Testing and commissioning
- Load and safety checks
- Final handover support
Our policy
Every charger is commissioned only after earthing, protection, and load checks pass — safety and documented handover before sign-off, never a shortcut.
Other services
Planning a project that needs ev charger installation & commissioning?
Tell us the site and requirement. We'll advise on scope, sequencing, and execution for your Himachal Pradesh project.