EVision India

Service

Electrical Installation Work

End-to-end electrical execution for EV charging stations including cabling, panels, earthing, protection systems, and power connectivity.

Step-by-step process

  1. 01

    Load assessment

    size the connection, cable, and protection to the charging load.

  2. 02

    Design & BOQ

    panel schedule, cable sizing, and protection scheme.

  3. 03

    Cabling & panels

    LT/DB panels, cable laying, and terminations.

  4. 04

    Protection

    MCB/MCCB/RCD/SPD installation per the design.

  5. 05

    Earthing integration

    bond the electrical system to the earthing grid.

  6. 06

    Testing

    insulation resistance, earth continuity, and polarity checks.

Standards we follow

  • IS/IEC 60364 low-voltage installation practice
  • IS 3043 earthing
  • Correct cable derating and protection coordination
  • DISCOM connection and metering requirements

Service level & commitments (SLA)

  • Design/BOQ shared before execution for approval
  • Test readings (IR, earth, polarity) documented at completion
  • Rework of any snag identified at testing at no extra cost
  • Handover pack with panel schedule and as-built notes

What's included

  • Cable laying
  • Panel installation
  • Protection device installation
  • DB / LT panel coordination
  • Electrical safety checks

Our policy

Electrical work is designed to the sanctioned load and protected to code — no under-specified cabling or protection to save cost, because that fails in the field.

Other services

Planning a project that needs electrical installation work?

Tell us the site and requirement. We'll advise on scope, sequencing, and execution for your Himachal Pradesh project.