Service
Canopy Fabrication & Installation
Design, fabrication, and installation support for EV charging station canopy structures.
Step-by-step process
- 01
Design
canopy size, layout, and load for the site and charger positions.
- 02
Fabrication
steel structure fabricated to drawing.
- 03
Foundation coordination
anchor bolts and base aligned with civil work.
- 04
Installation
erect, align, and fix the structure at site.
- 05
Sheeting & finishing
roofing, paint, and weatherproofing.
- 06
Safety checks
structural fixity and wind/load verification.
Standards we follow
- Structural steel fabrication good practice
- Wind-load and snow-load consideration for hill sites
- Anti-corrosion treatment and finishing
- Safe erection and anchoring practice
Service level & commitments (SLA)
- Design/drawing shared for approval before fabrication
- Structure aligned with civil foundation before final fixing
- Weatherproofing suited to Himachal conditions
- Handover after structural safety verification
What's included
- Canopy structure fabrication
- Installation at site
- Structural alignment
- Finishing work
- Safety checks
Our policy
Canopies are engineered for local wind and snow loads, not just appearance — structural safety is verified before handover.
Other services
EV Charger Installation & Commissioning
Charger installation, testing, and commissioning for every site type.
Learn more →Electrical Installation Work
Cabling, panels, protection, and power connectivity end to end.
Learn more →Civil Foundation Work
Foundations, pedestals, trenching, and site preparation.
Learn more →Planning a project that needs canopy fabrication & installation?
Tell us the site and requirement. We'll advise on scope, sequencing, and execution for your Himachal Pradesh project.