EVision India

Service

Earthing & Protection System

Reliable earthing and protection system work for safe EV charging operations.

Step-by-step process

  1. 01

    Assessment

    soil resistivity and protection requirement for the site.

  2. 02

    Earthing design

    electrode type, count, and layout for target resistance.

  3. 03

    Installation

    earth electrodes, pits, and bonding conductors.

  4. 04

    Protection setup

    MCB/MCCB/RCD/SPD installed and coordinated.

  5. 05

    Testing

    earth resistance and RCD trip tests.

  6. 06

    Documentation

    readings recorded for compliance and handover.

Standards we follow

  • IS 3043 earthing practice
  • RCD/SPD selection and coordination
  • Target earth resistance verified by measurement
  • Equipotential bonding of charger and structure

Service level & commitments (SLA)

  • Measured earth-resistance reading provided at handover
  • RCD trip test documented
  • Rework if readings fall outside the target
  • Compliance-ready documentation

What's included

  • Earthing installation
  • Protection device setup
  • MCB / MCCB / SPD installation
  • Safety testing
  • Compliance support

Our policy

Earthing is verified by measurement, not assumption — readings are documented, and anything outside target is reworked before sign-off.

Other services

Planning a project that needs earthing & protection system?

Tell us the site and requirement. We'll advise on scope, sequencing, and execution for your Himachal Pradesh project.